Tag: void reducing asphalt membrane

The J-Band Blog

Six Years and Counting: VRAM Continues to Protect The Longitudinal Joints of Ohio’s Roads

J-Band
What if I told you, that you could add 5 years of extra life to your roads? Would you do it? We know that when roads last longer, infrastructure money goes further. This is a very important topic given the vast amount of dollars that are invested in America's roads...
Continue Reading

Annual Review of J-Band Application in Pleasantville, OH

J-Band
Background Summary of Project Purpose Road managers know that the longitudinal joint is the first part of the pavement to fail. As a road’s most permeable part, this joint is susceptible to the elements. Air and water work down through this gap causing the joint to deteriorate, crack and pothole....
Continue Reading

Protect The Longitudinal Joint. Protect The Entire Road.

J-Band
Road managers know that the longitudinal joint is the first part of the pavement to fail. As a road’s most permeable part, this joint is susceptible to the elements. Air and water work down through this gap causing the joint to deteriorate, crack and pothole. And when the longitudinal joint...
Continue Reading

Annual Review ODOT’s Henry County US-6 VRAM Project

J-Band
Projects utilizing innovative technologies are frequently built with both a test and a control section to understand how that technology performs. Our teams have been involved in several test and control projects across the country to help us and our partners understand the long-term gains J-Band® can have on a...
Continue Reading

CAIT Evaluates the Performance of J-BAND® a Void Reducing Asphalt Membrane

J-Band
On September 22, 2022, Rutgers University's Department of Civil and Environmental Engineering and their Center for Advanced Infrastructure and Transportation (CAIT®) conducted a study on the Pennsylvania Turnpike evaluating the performance of J-Band®. About the Project A Void Reducing Asphalt Membrane (VRAM) project was performed on the Pennsylvania Turnpike between...
Continue Reading

Annual Review of ODOT’s J-Band® Project of Williams County US-6

J-Band
Background Summary of Project Purpose: Aside from ensuring that J-Band® is utilized in projects across the nation to provide longer-lasting safer roads, we often construct projects that have a test and control section to understand what impact J-Band can have on roads. Each year, these test and control projects undergo...
Continue Reading