Archives

The J-Band Blog

Steuben County, IN Enhances Its Performance of the Longitudinal Joint

J-Band
About this project: On the dates of May 16-19 of this year, a Void Reducing Asphalt Membrane, (VRAM), project took place. This project occurred on I-69 from Michigan State Line south to about 1.2 miles north of US-20 interchange. The Northbound lanes are the ones being worked on; the Southbound...
Continue Reading

Warrick County Investing Infrastructure Dollars with VRAM.

J-Band
About this project: A Void Reducing Asphalt Membrane, (VRAM), project took place on June 13 in Warrick County, Indiana. VRAM was placed on I-64 starting east of SR-61 and continuing to west of SR-161. The VRAM application was applied on the centerline of the pavement, as this is the most...
Continue Reading

Effingham County, Illinois Investing Infrastructure Dollars with VRAM.

J-Band
About this project On June 15, 2022, a Void Reducing Asphalt Membrane (VRAM) project took place in Effingham County, Illinois. This 136,294-foot project on US-40 went from Salt Creek to 1500th Avenue in Teutopolis. The VRAM application for the centerline joints was targeted at 18” wide. The VRAM applicator for...
Continue Reading

Sheboygan County, Wisconsin Responsibly Stewarding Public Resources with the use of VRAM.

J-Band
About this project: Pictured above: VRAM placed and settling on the road. This Void Reducing Asphalt Membrane (VRAM) project took place on June 28th in Sheboygan Falls, Wisconsin. This two-lane highway goes through a commercial warehouse section and a subdivision. The county is designating VRAM for not only the centerline,...
Continue Reading

VRAM Gaining Momentum in Michigan

J-Band
Road managers know that the longitudinal joint is the first part of the pavement to fail. As a road’s most permeable part, this joint is susceptible to the elements. Air and water work down through this gap causing the joint to deteriorate, crack, and pothole. And when the longitudinal joint...
Continue Reading

How Marshall County, IN Enhanced Its Performance of the Longitudinal Joint

J-Band
A Void Reducing Asphalt Membrane, (VRAM), project took place in Marshall County, Indiana on the beautiful afternoon on June 24, 2022. The work was done over 15 miles on US-30 from State Road 17 to State Road 19. Project Details On this day, VRAM was applied on the centerline joint...
Continue Reading