Steuben County Indiana invests in VRAM to Help Construct Longer-lasting, Safer Roads

The longitudinal joint is the Achilles’ heel of every road. Road managers know the first part of the pavement to fail is the longitudinal joint. As the road’s most permeable part, this joint is susceptible to the elements. Air and water work down through this unavoidable seam in the pavement...

Calumet County Wisconsin Helping to Create Longer Lasting, Safer Roads

Many states are looking for methods to improve longitudinal joint performance of their pavements, since these joints often fail before the rest of the surface. With the inherently lower density at the longitudinal joints we often see pavements fail by cracking, raveling, and potholing. Lower density is synonymous with higher...

Innovate at Centerline Rumble Strips

Here, the J-Band is applied on the centerline joint prior to the next pass of HMA. Check out the Here’s How it Works feature of Asphalt Materials’ J-Band® void reducing asphalt membrane on theasphaltpro.com to see how it works.   Many people have spent the past year working from home,...

A Materials Approach to Improving Asphalt Pavement Longitudinal Joint Performance

James Trepanier, Illinois Department of TransportationJohn Senger, Illinois Department of TransportationTodd Thomas, Asphalt Materials, Inc.Marvin Exline, Asphalt Materials, Inc. https://vimeo.com/497318812/8d291ef4d2 After performing for 12 years, the IDOT test pavements were evaluated and found to have longitudinal joints that exhibited significantly better performance than the control joint sections and were in...

The First Mover Advantage

A few months ago, we posted an article on the benefits of the Second Mover. It’s hard to argue that there are strong advantages to being a second mover. There is great opportunity in adopting something new at the point between its introduction and its industry-wide adoption- after it’s been...

Project Profile: Martin Luther King Drive

Martin Luther King Drive Waukegan, IL The Basics The Project The Results Location: Lake County, IL Date: May 18, 2016 Road Type: Major collector Project Length: 7,800 feet AADT: 5,800 Prime Contractor: Peter Baker and Sons J-Band Applicator: Road Fabrics, Inc. J-Band Supplier: Asphalt Materials, Inc. J-Band Field Engineer: Jim...